Research Development Manufacturing Operations Maintenance Management
OPTIMIZING CONSTRUCTION PROJECT LIFESPAN VALUE USING TOTAL QUALITY MANAGEMENT PRINCIPLES
Scindeks Assistant Scindeks Assistant — A system for serious journals and those aspiring to become one
PDF

Abstract

An effective strategy aligning costs and quality is pivotal for augmenting project value in the construction industry. This study develops and applies a model to evaluate the impact of Total Quality Management (TQM) principles on Egyptian construction projects. Objectives include identifying key TQM principles, quantifying their value, and validating outcomes through a case study. Methodologically, a TQM evaluation model, utilizing the Relative Importance Index (RII) method and validated via Cronbach’s alpha, is formulated. A value formula estimates the financial impact of top TQM principles compared to construction project life cycle costs. Applied to a 2023 Egyptian construction project case study, the formula demonstrates cost savings surpassing the required investment. Specifically, project value improved 2.77 times using the created Value Engineering Business Approach (VEBA) formula, translating to an estimated 12.8% reduction in total life cycle costs. This research advocates a data-driven approach to prioritize TQM principles, showcasing positive financial returns for firms and endorsing TQM as an effective framework for the Egyptian construction sector.

Keywords

Array
DOI: 10.5937/jaes0-51782

References

Elbanna, S., & Salem, S. (2023). "The impact of total quality management practices on organizational performance: A case study in the manufacturing sector." Total Quality Management & Business Excellence, 34(5), 623-637. https://doi.org/10.1080/14783363.2022.2069932

Khalil, T. M., El-Hadidy, M. A., & Alabd, R. (2021). Analysis of factors affecting construction delays in Egypt. Civil Engineering Journal, 7(7), 73-88. https://doi.org/10.28991/cej-2021-03091529.

Bröchner, J. (2021). Construction project management fiction: Individual values. International Journal of Project Management, 39(8), 731-740. https://doi.org/10.1016/j.ijproman.2021.07.001

Nguyen, H. T., & Tran, V. T. (2023). "Strategic compensation management and its impact on organizational performance: Evidence from the manufacturing sector." Journal of Management & Organization, 29(2), 256-272. https://doi.org/10.1017/jmo.2022.32

Youssef, M., AlDeep, S. M. H., & Olwan, M. M. (2023). Value engineering: Case study of Libyan educational buildings. Alexandria Engineering Journal, 76, 735-746. https://doi.org/10.1016/j.aej.2023.01.004

Sogaxa, A., Simpeh, E., & Fapohunda, J. (2020). Effective quality management strategies for enhancing the success rate of indigenous construction SMEs in construction project delivery. In IOP Conference Series: Earth and Environmental Science (Vol. 581, pp. 1-12). IOP Publishing. https://doi.org/10.1088/1755-1315/581/1/012074

El-Far, M., Sabry, R., & Kotb, M. (2023). Evaluating the effect of accelerated construction method on project life cycle cost. Infrastructure Asset Management, 10(3), 1-19. https://doi.org/10.1680/jinam.23.00008

Ali, K., & Johl, S. K. (2022). Critical success factors of total quality management practices using Pareto analysis. International Journal of Productivity and Quality Management, 14(2), 353-381. https://doi.org/10.1504/IJPQM.2022.122382

Patil, S. K., & Reddy, V. (2023). Optimizing construction project timelines using machine learning algorithms. Journal of Construction Engineering and Management, 149(2), 04023008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002315

Bouranta, N., & Fisscher, O. (2024). "Total quality management and its impact on organizational effectiveness: A meta-analysis." Total Quality Management & Business Excellence, 35(1), 68-85. https://doi.org/10.1080/14783363.2023.2233345

Coun, M. J. H., Peters, P., Blomme, R. J., & Schaveling, J. (2022). To empower or not to empower, that’s the question: Using an empowerment process approach to explain employees’ workplace proactivity. The International Journal of Human Resource Management, 33(19), 3881-3907. https://doi.org/10.1080/09585192.2022.2071368

Liao, S. H., Hu, D. C., & Shih, Y. S. (2021). Supply chain collaboration and innovation capability: The moderated mediating role of quality management. Total Quality Management & Business Excellence, 32(3-4), 298-316. https://doi.org/10.1080/14783363.2020.1831585

Rahimian, F. P., Seyedzadeh, S., Oliver, S., Rodriguez, S., & Dawood, N. (2020). On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning. Automation in Construction, 110, 103012. https://doi.org/10.1016/j.autcon.2020.103012

Rajaratnam, D., Jayawickrama, T. S., & Perera, B. (2021). Use of total quality management to enhance the quality of design and build projects. Intelligent Buildings International, 13(1), 1-17. https://doi.org/10.1080/17508975.2020.1815914

Souza, F. F. D., Corsi, A., Pagani, R. N., Balbinotti, G., & Kovaleski, J. L. (2022). Total quality management 4.0: Adapting quality management to Industry 4.0. The TQM Journal, 34(4), 749-769. https://doi.org/10.1108/TQM-06-2021-0188

Wang, X., Yang, J., Zhang, C., & Li, Y. (2024). "Application of value engineering in construction project management: A comprehensive review." Journal of Construction Engineering and Management, 150(3), 04024022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002537

Kulkarni, S., & Ranadive, M. (2022). Comparative study between proposed rigid pavement and flexible perpetual pavement for western alignment of Pune Ring Road. In Recent Advancements in Civil Engineering. Journal of Urban Planning and Development, 148(3), 741-752. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000786

Ginigaddara, B., Perera, S., Feng, Y., Rahnamayiezekavat, P., & Thomson, R. (2023). Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(4), 1-20. https://doi.org/10.1080/01446193.2023.2216989

Zhou, X., Zhang, Y., Li, H., & Zhang, X. (2024). "A framework for life cycle cost analysis in building maintenance: A case study of green buildings." Journal of Cleaner Production, 396, 136390. https://doi.org/10.1016/j.jclepro.2023.136390

Khalilian, M., Shakib, H., & Basim, M. C. (2022). Proposed time-dependent approach to seismic loss evaluation through the life cycle of a structure. In Structures, 36, 280-290. Elsevier. https://doi.org/10.1016/j.istruc.2022.03.013

Singh, V., Sharma, R., & Gupta, P. (2023). Integrating AI and IoT for enhanced project management in construction. Journal of Construction Engineering and Management, 149(4), 04023022. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002322

Choi, Y., & Park, Y. (2023). "Enhancing organizational efficiency through total quality management: A review of recent advances and future directions." Total Quality Management & Business Excellence, 34(3), 123-145. https://doi.org/10.1080/14783363.2023.2152431

Varma, S. (2022). Implementing Atma Nirbhar Bharat: A project management approach. In Transitioning from Globalized to Localized and Self-Reliant Economies (pp. 190-207). IGI Global.

Khan, M. A., Zubair, M., & Ali, A. (2023). Enhancing project delivery through digital twin technology: A case study in construction management. Automation in Construction, 153, 104286. https://doi.org/10.1016/j.autcon.2023.104286

Xiong, W., Huang, H., Li, L., Gan, L., Zhu, L., & Liu, Z. (2022). Energy consumption evaluation in stamping workshops via a discrete event simulation-based approach. International Journal of Precision Engineering and Manufacturing-Green Technology, 1(1), 1-20. https://doi.org/10.1007/s40684-022-00110-2

Daneshdoost, F., Hajiaghaei-Keshteli, M., Sahin, R., & Niroomand, S. (2022). Tabu search based hybrid meta-heuristic approaches for schedule-based production cost minimization problem for the case of cable manufacturing systems. Informatica, 33(1), 1-24. https://doi.org/10.15388/informatica.2022.35.

Lee, J., Kim, D., & Park, C. (2023). Predicting construction project delays using deep learning techniques: Evidence from a large-scale dataset in the UAE. Journal of Management in Engineering, 39(1), 04022055. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000965.

Sánchez-Franco, M. J., Calvo-Mora, A., & Periáñez-Cristobal, R. (2023). Clustering abstracts from the literature on quality management (1980–2020). Total Quality Management & Business Excellence, 34(7-8), 959-989.

Mahajan, P. S., Raut, R. D., Kumar, P. R., & Singh, V. (2023). Inventory management and TQM practices for better firm performance: A systematic and bibliometric review. The TQM Journal.

Jiang, X., Li, Q., & Liu, M. (2024). Critical success factors in managing construction projects: An integrated framework and empirical analysis. Journal of Construction Engineering and Management, 150(3), 04024015. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002427.

Wang, T., Chan, A. P. C., He, Q., & Xu, J. (2022). Identifying the gaps in construction megaproject management research: A bibliographic analysis. International Journal of Construction Management, 22(9), 1585-1596. https://doi.org/10.1080/15623599.2022.2079082

Yesica, G. J., Ichsan, M., Kertapati, M. S., Aditya, B., & Pradana, A. (2023). Project management office manager's competencies: Systematic literature review. International Journal of Project Organisation and Management, 15(2), 253-278.

Jin, R., Zhou, W., Liu, X., & Zhang, Y. (2023). Enhancing construction project efficiency through AI-driven decision support systems. Journal of Construction Engineering and Management, 149(5), 04023030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002330

Vera, A., & Zapata, C. M. (2022). Best practices of business process improvement: Towards a representation on top of the Quintessence kernel. Business Process Management Journal, 28(3), 876-903. https://doi.org/10.1108/BPMJ-04-2021-0204

Lin, X., Ho, C. M., & Shen, G. Q. (2018). For the balance of stakeholders’ power and responsibility: A collaborative framework for implementing social responsibility issues in construction projects. Management Decision, 56(3), 550-569. https://doi.org/10.1108/MD-07-2017-0727

Singh, V., Sharma, P., & Gupta, S. (2023). Improving construction productivity in infrastructure projects through digital tools and lean techniques. Journal of Construction Engineering and Management, 149(3), 04023015. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002535

Li, Y., Zhang, J., & Wang, Y. (2023). Advancements in sustainable construction: Integrating eco-friendly materials and methods. Journal of Cleaner Production, 395, 136393. https://doi.org/10.1016/j.jclepro.2023.136393

Narayanasamy, K., & Basu, S. (2022). Balancing sustainability with quality in construction projects: A case study of small and medium-sized contractors. Construction Management and Economics, 40(5), 391-410. https://doi.org/10.1080/01446193.2022.2110530

Ndihokubwayo, R., & Haupt, T. (2022). Total quality management systems in construction: A roadmap for small and medium-sized contractors. Construction Management and Economics, 40(4), 329-346. https://doi.org/10.1080/01446193.2022.2058947

Gomes, C. F., & Ribeiro, P. A. (2023). TQM and lean production implementation in SMEs: A systematic review and future research agenda. The TQM Journal, 35(3), 561-579. https://doi.org/10.1108/TQM-08-2022-0186

Autori koji objavljuju u ovom časopisu pristaju na sledeće uslove:

  1. Autori zadržavaju autorska prava i pružaju časopisu pravo prvog objavljivanja rada i licenciraju ga Creative Commons licencom koja omogućava drugima da dele rad uz uslov navođenja autorstva i izvornog objavljivanja u ovom časopisu.
  2. Autori mogu izraditi zasebne, ugovorne aranžmane za neekskluzivnu distribuciju rada objavljenog u časopisu (npr. postavljanje u institucionalni repozitorijum ili objavljivanje u knjizi), uz navođenje da je rad izvorno objavljen u ovom časopisu.
  3. Autorima je dozvoljeno i podstiču se da postave objavljeni rad onlajn (npr. u institucionalnom repozitorijumu ili na svojim internet stranicama) pre i tokom postupka prijave priloga, s obzirom da takav postupak može voditi produktivnoj razmeni ideja i ranijoj i većoj citiranosti objavljenog rada (up. Efekat otvorenog pristupa).

Downloads

Download data is not yet available.