Research Development Manufacturing Operations Maintenance Management
SOLVING PROBLEMS IN WOOD PARQUET PRODUCTION BY USING “7 STEPS” OF WORLD CLASS MANUFACTURING (WCM) METHODOLOGY
Scindeks Assistant Scindeks Assistant — A system for serious journals and those aspiring to become one
PDF

Supplementary Files

menadzer, Grafici.xlsx (Serbian (Latin))

Abstract

The paper presents the method for solving the problem in production by using “7 steps” of World Class Manufacturing Methodology (WCM). For each company with serial production, it is important to know what to “attack to achieve goals and to increase the OEE”. The goal of each company is to reduce financial losses but it is important to how to achieve that. In this case one of chronic problems in lacquering line goes to loss due to the splitting of sanding paper in the share of 27% of process loss, or 7% of all losses for that line. The way to solve this problem was by using “7 Steps”. Indicator for solving the problem was % of influence on Overall equipment effectiveness (OEE). A more detailed analysis shows that there are four possible causes of this problem. Type and quality of paper end connection had the biggest impact. The problem was solved by changing quality of paper and its connection. One very “easy” solution for unnoticed loss caused very big saving for the company.

Keywords

Array
Array
Array
Array
Array
Array
Array
DOI: 10.5937/jaes12-5532

References

Bourne M., Mills J., Wilcox M., Neely A., Platts K. (2000) Designing, implementing and updating performance measurement systems, International Journal of Operations & Production Management, Vol. 20 No. 7, 2000, 754-771.

Ericsson, J. (1997), Disruption Analysis – An Important Tool in Lean Production, Department of Production and Materials Engineering, Lund University, Lund.

Jonsson, P., Lesshammar, M. (1999): “Evaluation and improvement of manufacturing performance measurement systems - the role of OEE”, International Journal of Operations & Production Management, Vol. 19 Iss: 1, 55 – 78.

Ljungberg, Ö. (1997) Att Första & Tillämpa TPM (in Swedish), Novum Grafiska AB, Gothenburg.

Nakajima, S. (1988) An Introduction to TPM, Productivity Press, Portland, OR.

Nord, C., Pettersson, B., Johansson, B. (1997), TPM: Total Productive Maintenance med Erfarenhet fran Volvo (in Swedish), Idrottens Grafiska i Göteborg AB, Mölnlycke.

Popović, V., Vasić, B., & Curović, D. (2008): Failure modes, effects and risks analysis:

FMERA. Journal of Applied Engineering Science, 6(20), 33-42.

Popović, V., Vasić, B., & Curović, D. (2010): A possible answer to the question: What is

asset management?. Journal of Applied Engineering Science, 8(4), 205-214.

Schmenner, R.W. and Vollmann, T.E. (1994): Performance measures: gaps, false alarms

and the ‘usual suspects, International Journal of Operations and Production Management,

Vol. 14 No. 12, 58-69.

Tajiri, M. and Gotoh, F. (1992), TPM Implementation: A Japanese Approach, McGraw- Hill, New York, NY.

Autori koji objavljuju u ovom časopisu pristaju na sledeće uslove:

  1. Autori zadržavaju autorska prava i pružaju časopisu pravo prvog objavljivanja rada i licenciraju ga Creative Commons licencom koja omogućava drugima da dele rad uz uslov navođenja autorstva i izvornog objavljivanja u ovom časopisu.
  2. Autori mogu izraditi zasebne, ugovorne aranžmane za neekskluzivnu distribuciju rada objavljenog u časopisu (npr. postavljanje u institucionalni repozitorijum ili objavljivanje u knjizi), uz navođenje da je rad izvorno objavljen u ovom časopisu.
  3. Autorima je dozvoljeno i podstiču se da postave objavljeni rad onlajn (npr. u institucionalnom repozitorijumu ili na svojim internet stranicama) pre i tokom postupka prijave priloga, s obzirom da takav postupak može voditi produktivnoj razmeni ideja i ranijoj i većoj citiranosti objavljenog rada (up. Efekat otvorenog pristupa).

Downloads

Download data is not yet available.