Imetieg, Abdallah Ali, i Miroslav Lutovac. 2015. „Project scheduling method with time using MRP system - A case study: Construction project in Libya“. The European Journal of Applied Economics 12 (1). https://doi.org/10.5937/ejae12-7815.